Arrival of Pipes Installation of a New Transmission Pipeline for Hargeisa Urban Water Project

Dedicated for Somaliland politics and affairs.

Moderator: Moderators

User avatar
Togdeer
SomaliNet Heavyweight
SomaliNet Heavyweight
Posts: 2867
Joined: Tue May 27, 2014 11:43 pm

Re: Arrival of Pipes Installation of a New Transmission Pipeline for Hargeisa Urban Water Project

Post by Togdeer »

Aishah wrote:instead of using xabaashi water
How about we try filtering bada cas if it works for dubai then why not us..but we have to filter it better than Djibouti tho :scusthov:
Disalination costs billions of $. It also uses up a lot of energy. Also building the pipeline would cost hundreds of millions of $. Also 1 disalitation plant is not enough to supply the whole of hargeisa. The best option for now is to create a reservoirs to capture the huge amounts of water lost to the sea.
User avatar
abdikarim86
SomaliNet Super
SomaliNet Super
Posts: 12077
Joined: Sun Sep 14, 2008 7:21 am
Location: Bristol

Re: Arrival of Pipes Installation of a New Transmission Pipeline for Hargeisa Urban Water Project

Post by abdikarim86 »

Hawdian and his love for xabashi is never ending.

:pacspit:
User avatar
LiquidHYDROGEN
SomaliNet Super
SomaliNet Super
Posts: 14522
Joined: Fri Mar 16, 2007 10:48 am
Location: Back home in Old Kush

Re: Arrival of Pipes Installation of a New Transmission Pipeline for Hargeisa Urban Water Project

Post by LiquidHYDROGEN »

Somaliland has enough annual rainfall and underground aquifers. Desalination plants are expensive and require technical experience Somalis don't have. I would suggest using Solar power as a means of energy to desalinate Sea water in the future but for now we must first use what is at our disposal i.e. the underground water tables.
Post Reply
  • Similar Topics
    Replies
    Views
    Last post

Return to “Politics - Somaliland”